Gas pipeline with a new gas compressor station (CS-14)
Total Length: 630 km
Total Capacity: 4BCMA
Tariff Structure to be agreed as per transmitted gas (per each m3)
Gas pipeline with a new gas compressor station (CS-14)
Total Length: 630 km
Total Capacity: 4BCMA
Tariff Structure to be agreed as per transmitted gas (per each m3)